In the Fab Lab, First, we have decided the design of stand and cut the different parts of the stand. Parts: Four hollow rods of similar size with slanted at one of the ends (1) Four hollow rods of similar size

(2) Four small hollow cylinders of similar size with slanted at one of the ends (1’) Four small hollow cylinders of similar size (2’) (1) and (1’) will be weld together. (1) Can go inside (2), so that it can make adjustable. (4) is welded to the frame. The whole stand can be able to adjust and made it fix to the frame.

We just attached the ropes instead of strips and tested by putting the different types of loads on the frame.

Today, there were the different process of making of frames and stands.

  • Cutting

  • Grinding

  • Welding

Today, All the members of the team have given their best input.